We’d like to remind Forumites to please avoid political debate on the Forum.
This is to keep it a safe and useful space for MoneySaving discussions. Threads that are – or become – political in nature may be removed in line with the Forum’s rules. Thank you for your understanding.
PLEASE READ BEFORE POSTING: Hello Forumites! In order to help keep the Forum a useful, safe and friendly place for our users, discussions around non-MoneySaving matters are not permitted per the Forum rules. While we understand that mentioning house prices may sometimes be relevant to a user's specific MoneySaving situation, we ask that you please avoid veering into broad, general debates about the market, the economy and politics, as these can unfortunately lead to abusive or hateful behaviour. Threads that are found to have derailed into wider discussions may be removed. Users who repeatedly disregard this may have their Forum account banned. Please also avoid posting personally identifiable information, including links to your own online property listing which may reveal your address. Thank you for your understanding.
📨 Have you signed up to the Forum's new Email Digest yet? Get a selection of trending threads sent straight to your inbox daily, weekly or monthly!
New home purchase council approval for new phase of development
brzone
Posts: 24 Forumite
original post deleted for privacy
0
Comments
-
We have now exchanged contract, but we are not really happy about phase 2 application.
What can we do with it?
The only way you would have a claim against the developer is if they misrepresented something in the contract or pre-contract enquiries.
e.g. If your solicitor asked their solicitor about the phase 2 plans, and they gave a misleading answer.
And/or if planning consent hasn't already been decided, you can lodge an objection. But the planning authority will only take into account 'material planning considerations'.
(I don't fully follow your post, but you mention dangerous driveways and a T junction... 'Highway safety' and 'vehicular access' are 'material planning considerations'.)
More info here: http://www.rtpi.org.uk/media/686895/Material-Planning-Considerations.pdf
But if planning consent has been granted, there is very little you can do.0 -
You're buying a house that's part of phase 1 of a large multi-phase development, and you're complaining that there's going to be more development...?0
-
Developers often change their original "plans" which are just illustrative sketches used to get the whole scheme approved. They then increase density and reduce aesthetic aspects to save money when it comes to actually filling for planning permission for each phase0
-
The new homes have been designed in a range of sizes and layouts to suit a variety of people, including a greater provision of family housing and fewer apartments in line with local demand and aspirations. The architecture of the second phase complements the existing development with traditionally inspired materials that blend with the local vernacular. These are reworked in a contemporary way, while design details are included that give the new phase a character of its own.
The plans will also see the creation of a new central ‘village green’, which will become the heart of Horsted Park. This will connect with two parks – one already built as part of phase one and one to come as part of phase 2 - and a circular green walk, as well as providing a link to the surrounding countryside, to create an attractive and usable public realm.
The extra care apartments will offer real benefits to older people, providing residents with their own self-contained home, normal tenancy rights and independence, in an environment able to offer as much or as little assistance as needed. The extra care apartments are designed around a south facing central courtyard into which the community facilities look, whilst the majority of the apartments look out onto the open countryside surrounding the site. In the same building, two well-equipped community rooms will be created providing useful event space and a restaurant is also proposed. Both of these facilities will be for use by residents and the local community.0 -
Personally I'd rather have cars driving next to house than a footpath
If planning permission is given not a lot you can do.
You could ask the builder if they are willing to drop the purchase - but as you've exchanged contracts - they don't have to.
Your lawyer should have given you details about the planning application as part of the searches.
It takes months, even years to get planning permission for large sites. I cannot believe you were not provided with info - so you may have a case against your lawyer.0 -
It takes months, even years to get planning permission for large sites. I cannot believe you were not provided with info - so you may have a case against your lawyer.
Outlying planning will have been granted for the whole development. This will include a rough layout, a total number of dwellings, concept drawings, services and facilities to be provided.
They then go for detailed planning on phase one, which will include the detailed drawings of each dwelling, and detailed layouts of the infrastructure related to phase 1
OP has bought from this.
They have now gone for detailed planning on phase 2, which is what the OP doesn't like.
OP, you are stuck.0
This discussion has been closed.
Confirm your email address to Create Threads and Reply
Categories
- All Categories
- 355K Banking & Borrowing
- 254.6K Reduce Debt & Boost Income
- 455.7K Spending & Discounts
- 247.8K Work, Benefits & Business
- 604.9K Mortgages, Homes & Bills
- 178.7K Life & Family
- 262.5K Travel & Transport
- 1.5M Hobbies & Leisure
- 16.1K Discuss & Feedback
- 37.7K Read-Only Boards