We'd like to remind Forumites to please avoid political debate on the Forum... Read More »
📨 Have you signed up to the Forum's new Email Digest yet? Get a selection of trending threads sent straight to your inbox daily, weekly or monthly!
Earthing Requirements

mchu6am4
Posts: 445 Forumite
Hi,
Can someone tell me the earthing requirements in terms of cable sizes & earthing points etc.
I know that the water & gas supply should be earthed at the entry to the house directly from the consumer unit (I am using 10mm cable).
I need to know whether its essential to run earth cable from the consumer unit for earthing the bathroom plumbing (pipes + metal bath etc.) and same question for kitchen please.
Many thanks in advance.
Ash
Can someone tell me the earthing requirements in terms of cable sizes & earthing points etc.
I know that the water & gas supply should be earthed at the entry to the house directly from the consumer unit (I am using 10mm cable).
I need to know whether its essential to run earth cable from the consumer unit for earthing the bathroom plumbing (pipes + metal bath etc.) and same question for kitchen please.
Many thanks in advance.
Ash
0
Comments
-
Good morning: The IEE produces 2 excellent guides http://www.amazon.co.uk/exec/obidos/ASIN/0863413749
http://www.amazon.co.uk/Electricians-Building-Regulations-Electrical-Dwellings/dp/086341463X/ref=pd_sim_b_2/026-0028382-0562807
My OH, Corgi Guy, uses both for reference. After the 17th Edition Wiring Regulations comes out in 2008, the IEE will publish new versions of both guides.
HTH
CanuckleheadAsk to see CIPHE (Chartered Institute of Plumbing & Heating Engineering)0 -
if you need to ask then you are probably not qualified or experienced to do this properly, dont mess about with it, also the work you are doing will probably be a breach of part p regulations, get a proper qualified electrician in to at least check your work, saving money is one thing being dangerous is another0
-
yes 10mm to your gas and main incoming water.kitchens don't need to be bonded,there is an argument over the pipes to a boiler.the bonding in the bathroom do'snt go back the the cu,but you have to bond all metalwork,and any electrical circuit that enters the bathroom e:g lights,shower,fans.together.
but is your plumbing copper or plastic,if you are unsure about any part of it you should really get someone in to do it.i don't think bonding comes under part p.0
This discussion has been closed.
Confirm your email address to Create Threads and Reply

Categories
- All Categories
- 351.2K Banking & Borrowing
- 253.2K Reduce Debt & Boost Income
- 453.7K Spending & Discounts
- 244.2K Work, Benefits & Business
- 599.3K Mortgages, Homes & Bills
- 177.1K Life & Family
- 257.7K Travel & Transport
- 1.5M Hobbies & Leisure
- 16.2K Discuss & Feedback
- 37.6K Read-Only Boards