We'd like to remind Forumites to please avoid political debate on the Forum... Read More »
📨 Have you signed up to the Forum's new Email Digest yet? Get a selection of trending threads sent straight to your inbox daily, weekly or monthly!
Electric regs and kitchen mods.
Options

getmore4less
Posts: 46,882 Forumite



We are planning stage of a kitchen refit and if we include certain things it will require moving some electrics in our kitchen, sockets and DP switches.
Are there any regs that would require us to update anything else.
eg. we have a 20yo consumer unit(cart fuses) split load 6+2(with space).
We probably should upgrade this anyway and have a full check, I see the fully populated CU come in at £50-£100, what would the likely cost be to have this done?
Are there any regs that would require us to update anything else.
eg. we have a 20yo consumer unit(cart fuses) split load 6+2(with space).
We probably should upgrade this anyway and have a full check, I see the fully populated CU come in at £50-£100, what would the likely cost be to have this done?
0
Comments
-
Any cables buried in walls and new socket positions will require RCD protection - so I suspect that this means your kitchen circuits - lights, sockets and oven if separate, will require it
Not clear from your description if there is RCD protection already in your consumer unit. can you post a pic? If there is no RCD, it might be possible to retrofit, but it will depend on the make and age of the board
If you do got for a board upgrade, get your electrician to supply it - I wouldn't be too keen on fitting a £50 one....
In terms of how long will it take - well I carry out a full test and inspect of all circuits before the unit change to find out (and correct) if there are any underlying faults , then do the changeover. Generally this will be about 2 days of work depending on the number of faults
A consumer unit change is part P (Building Regs) notifiable - changes to the kitchen circuits are now not notifiable
Hope this helps
SB0 -
Not clear from your description if there is RCD protection already in your consumer unit.getmore4less wrote: »I see the fully populated CU come in at £50-£100, what would the likely cost be to have this done?
I recently supplied and fitted a 12 way Wylex CU and charged £350 which included testing, certification, and upgrading the earth supply in Farnborough (Hampshire).
As Fluffpot has already said, a fully populated £50 CU isn't something I'd be overly keen on using.Understeer is when you hit a wall with the front of your car
Oversteer is when you hit a wall with the back of your car
Horsepower is how fast your car hits the wall
Torque is how far your car sends the wall across the field once you've hit it0 -
OP did say split load though.... I have seen foreign (Italian, maybe?) makes of CU's with RCD's and cartridge fuses before now0
-
OP did say split load though....
If there is an RCD in place, my money says it's only to protect a shower that may have been added at some point.
I'll have a gentlemen's bet with you whilst we wait for them to post a confirmation picUndersteer is when you hit a wall with the front of your car
Oversteer is when you hit a wall with the back of your car
Horsepower is how fast your car hits the wall
Torque is how far your car sends the wall across the field once you've hit it0
This discussion has been closed.
Confirm your email address to Create Threads and Reply

Categories
- All Categories
- 351.2K Banking & Borrowing
- 253.2K Reduce Debt & Boost Income
- 453.7K Spending & Discounts
- 244.2K Work, Benefits & Business
- 599.3K Mortgages, Homes & Bills
- 177K Life & Family
- 257.6K Travel & Transport
- 1.5M Hobbies & Leisure
- 16.2K Discuss & Feedback
- 37.6K Read-Only Boards