Had a quote for a number of electrical items to be done:
1) For replacing the existing consumer unit for new 17th edition dual RCD consumer unit and issue a certificate on completion if the installation complies to current regs.
2) For wiring and fitting 6 spot lights in bathroom
3) For wiring and fitting 3 spot lights on landing and 1 wall light
4) For wiring and fitting 8 spot lights in kitchen
5) For wiring and fitting 8 spot lights in dining room
6) For moving shower isolator switch to a better position
Quote does not include LED spot lights
Cost - £1250.
1) For replacing the existing consumer unit for new 17th edition dual RCD consumer unit and issue a certificate on completion if the installation complies to current regs.
2) For wiring and fitting 6 spot lights in bathroom
3) For wiring and fitting 3 spot lights on landing and 1 wall light
4) For wiring and fitting 8 spot lights in kitchen
5) For wiring and fitting 8 spot lights in dining room
6) For moving shower isolator switch to a better position
Quote does not include LED spot lights
Cost - £1250.
0
Comments
-
I'd expect that job to take 2-2 1/2 days but without seeing anything its hard to say. £800 would be better.pvoutput.org/intraday.jsp?id=39350&sid=359520
-
MonsieurFrugal wrote: »I'd expect that job to take 2-2 1/2 days but without seeing anything its hard to say. £800 would be better.
Thanks. I thought it reasonable at first but then realised would be another £300 ish for the LED fittings and lamps.
We are SW based.0
This discussion has been closed.
Categories
- All Categories
- 343.4K Banking & Borrowing
- 250.2K Reduce Debt & Boost Income
- 449.8K Spending & Discounts
- 235.5K Work, Benefits & Business
- 608.4K Mortgages, Homes & Bills
- 173.2K Life & Family
- 248.1K Travel & Transport
- 1.5M Hobbies & Leisure
- 15.9K Discuss & Feedback
- 15.1K Coronavirus Support Boards