Large Quote seems high?

I have the following which I have been quoted. Would love some feedback to see if its reasonable even if I think its quite high. In Surrey so I know things can usually be higher!!!

Electrical:
2 x wired smoke detectors
1x Heat detector
2 x external Double sockets
14 x double sockets
9 x Network sockets
24 x LV lights
3 x Extractor fans
Cooker Extractor
3 x External light connections (not including fittings)
Boiler Connection after moving boiler
2 x pull cords
1 x external light switch
5 x dimmer switch

Plumbing:
Move boiler
2 x Plumb radiator
2 x towel rails plumbed
Plumb kitchen sink

Building Work
Open up kitchen/diner doorway
Supply and install 3 RSJ beams
Enlarge kitchen/family room (size of room will be 4.9m x 4.9 approx)
Supply bifold door for kitchen/diner doorway
Add new doorway to utility room
redecroate utility room and kitchen/diner
NOT including kitchen fitting or flooring

Building work part 2:
Create extension (will be bathroom) (4m x 1m) including knock through from hallway and decorated (not including fitting shower w/c etc)

First Floor Extension
Create extension 5m x 3m and decorate (no floor covering)


Extra bit:

Add new soakaway to front garden

Given a quote of around £60K + VAT

Any thoughts on this anyone?

Thanks for any feedback.

Comments

  • Canucklehead
    Canucklehead Posts: 6,254 Forumite
    clewis1573 wrote: »
    I have the following which I have been quoted. Would love some feedback to see if its reasonable even if I think its quite high. In Surrey so I know things can usually be higher!!!

    Electrical:
    2 x wired smoke detectors
    1x Heat detector
    2 x external Double sockets
    14 x double sockets
    9 x Network sockets
    24 x LV lights
    3 x Extractor fans
    Cooker Extractor
    3 x External light connections (not including fittings)
    Boiler Connection after moving boiler
    2 x pull cords
    1 x external light switch
    5 x dimmer switch

    Plumbing:
    Move boiler
    2 x Plumb radiator
    2 x towel rails plumbed
    Plumb kitchen sink

    Building Work
    Open up kitchen/diner doorway
    Supply and install 3 RSJ beams
    Enlarge kitchen/family room (size of room will be 4.9m x 4.9 approx)
    Supply bifold door for kitchen/diner doorway
    Add new doorway to utility room
    redecroate utility room and kitchen/diner
    NOT including kitchen fitting or flooring

    Building work part 2:
    Create extension (will be bathroom) (4m x 1m) including knock through from hallway and decorated (not including fitting shower w/c etc)

    First Floor Extension
    Create extension 5m x 3m and decorate (no floor covering)


    Extra bit:

    Add new soakaway to front garden

    Given a quote of around £60K + VAT

    Any thoughts on this anyone?

    Thanks for any feedback.


    The only way to know whether a quote is reasonable is to get more quotes (full specification from trades recommended to you by a source you trust who have conducted a site survey and discussed your requirements) then compare like for like.

    Canucklehead
    Ask to see CIPHE (Chartered Institute of Plumbing & Heating Engineering)
  • keystone
    keystone Posts: 10,916 Forumite
    Absolutely you must get two more quotes for the same SOW.

    Cheers
    The difference between genius and stupidity is that genius has it's limits. - Einstein
  • bigmac12
    bigmac12 Posts: 14 Forumite
    Get more quotes.

    You could lower your costs by getting individual tradesmen but this will be more hassle as you are having extensions where some tradesmen cannot do their job in continuous working days.

    This may help you:

    I had a new WB combi boiler fitted in my loft (was previously in my kitchen) a couple months back. Cost me £2200 for 2 days work (2 plumbers) including materials (copper pipe is expensive!).
  • Thanks all.

    I am waiting on a few quotes so will find out soon enough. I have read about the £1K per sq/m for extensions but don't think its a good enough guide as it depends on what you're having done.

    One more thing to ask, with regards to Payments, would you expect to pay any fees on commencement of works or would it be after work starts?

    Personally I wouldn't expect to pay anything for materials etc as the build "should" have a decent trading account with a building supplier. Or am I being totally incorrect in my thinking?
  • phill99
    phill99 Posts: 9,092
    Part of the Furniture 1,000 Posts
    Forumite
    Fees for planning permission (if applicable) and building regulation consent will need to be paid prior to work commencement of works.

    In terms of payments to the builder, he may ask for a deposit and will require regular payments, either fortnightly or on an agreed stage payment basis. Just because a builder may have a credit account at a builders merchants, it doesn't mean he doesn't have to pay for the goods. If you don't pay him, his credit ceases and he'll get no more materials. There ate also expenses that he can't get on credit such a fuel for the van and to pay his workers or sub contractors.
    Eat vegetables and fear no creditors, rather than eat duck and hide.
  • paye
    paye Posts: 449
    Part of the Furniture 100 Posts Combo Breaker
    Forumite
    edited 13 June 2012 at 10:51PM
    I'd estimate between £45-50k from what you have listed out, but obviously I maybe way out with my forecast for not seeing the job in detail.

    But like everyone has said my advise would be to get at least 3-4 quotes and compare apples for apples. Don;t always necessarily go with the cheapest. Have a proper contract in place which clearly states the payment terms and programme, and always ask to see a copy of their insurance details when carrying out any major structural work. Again if it was me I'd agree with the builder to hold a bit of retention on the overall contract value, anything between 3-5%.
    Save Save Save:o

    SPC 593 paye:o
  • clewis1573
    clewis1573 Posts: 4 Newbie
    edited 14 June 2012 at 7:32AM
    @phill99 - didn't think about that -thank you for that!

    For the others, thank you again!



    I meant didn't think of the credit part - already done the building regs and planning permission etc etc!
  • dawyldthing
    dawyldthing Posts: 3,438 Forumite
    i really would break it down and get different people in. We paid under 2.5k for 6 radiators and a valliant boiler, 1400 cash for a full rewire. Id guess your plumbing would take a day so 400 roughly i would guess. Not sure about the rest, but that seems really really expensive
    :T:T :beer: :beer::beer::beer: to the lil one :) :beer::beer::beer:
This discussion has been closed.
★ ★ ★ Meet your Ambassadors

Categories

  • All Categories
  • 356K Banking & Borrowing
  • 255K Reduce Debt & Boost Income
  • 456.3K Spending & Discounts
  • 248.5K Work, Benefits & Business
  • 606.3K Mortgages, Homes & Bills
  • 179.1K Life & Family
  • 264.1K Travel & Transport
  • 1.6M Hobbies & Leisure
  • 16.2K Discuss & Feedback
  • 37.7K Read-Only Boards
Quick Search

Is this how you want to be seen?

We see you are using a default avatar. It takes only a few seconds to pick a picture.