Glow Worm flue/fan problem help please.

111KAB
111KAB Posts: 3,645 Forumite
1,000 Posts Combo Breaker
GlowWorm75E.jpg

Above pic shows where 90 degree flue pipe has moved away from fan outlet on top of Glow Worm Compact E75 combi boiler causing the engineer to condemn the installation and switch off gas supply. Engineer now preparing a quote to replace both fan and 90 degree pipe plus (possibly) a further length of outlet pipe. As the 90 degree pipe has 'come away' from the fan there is an escape of gas thus resulting in the condemnation.

My questions (on behalf of the occupier) are,
  1. Surely the fan does not need replacing, as the engineer states this is working ok, if it was a separate part before why cannot it remain so?
  2. It appears that the 90 degree bend has just worked loose as there is no fixing method merely it is pushed onto the fan outlet pipe - can it not just be 'pushed' back on?
  3. Is the occupier (do you think) being taken for a 'ride'?
My main concern is to ensure matters are dealt with correctly. There is a carbon monoxide detector fitted but this did not alert the occupier to any proplem. The batteries have been replaced in this on a regular basis. The engineer left (he expects to be appointed for the new installation) without leaving any report.
Thanking you for your advise.

Comments

  • Canucklehead
    Canucklehead Posts: 6,254 Forumite
    Hi: what is the context for the RGI's visit?

    Canucklehead
    Ask to see CIPHE (Chartered Institute of Plumbing & Heating Engineering)
  • 111KAB
    111KAB Posts: 3,645 Forumite
    1,000 Posts Combo Breaker
    edited 3 May 2012 at 10:31AM
    Hi: what is the context for the RGI's visit?
    Canucklehead

    Apologies Canucklehead I am not sure re RGI - if this refers to the Engineer then he was called in as the boiler had not been serviced for some time and occupier thought it prudent to have it serviced. Thanks.
  • Canucklehead
    Canucklehead Posts: 6,254 Forumite
    111KAB wrote: »
    Apologies Canucklehead I am not sure re RGI - if this refers to the Engineer then he was called in as the boiler had not been serviced for some time and occupier thought it prudent to have it serviced. Thanks.

    Hi: RGI = Registered Gas Installer i.e. Gas Safe Registered. No report/warning label? Is the 'occupier' the owner of the property or a tenant?

    Canucklehead
    Ask to see CIPHE (Chartered Institute of Plumbing & Heating Engineering)
  • 111KAB
    111KAB Posts: 3,645 Forumite
    1,000 Posts Combo Breaker
    Engineer is Gas Safe Registered. Occupier is part owner - property purchased late last year as repossession so bought as seen, warts and all. Part owner/occupier knows they are responsible for any remedial works (including total new boiler if necessary) - no report/warning label but in fairness I understand Engineer is in contact with occupier with a view to carrying out work today/tomorrow but no quote as yet.
  • Canucklehead
    Canucklehead Posts: 6,254 Forumite
    111KAB wrote: »
    Engineer is Gas Safe Registered. Occupier is part owner - property purchased late last year as repossession so bought as seen, warts and all. Part owner/occupier knows they are responsible for any remedial works (including total new boiler if necessary) - no report/warning label but in fairness I understand Engineer is in contact with occupier with a view to carrying out work today/tomorrow but no quote as yet.

    In that case the part-owner/occupier should get a second opinion before further works are undertaken.
    Ask to see CIPHE (Chartered Institute of Plumbing & Heating Engineering)
  • 111KAB
    111KAB Posts: 3,645 Forumite
    1,000 Posts Combo Breaker
    In that case the part-owner/occupier should get a second opinion before further works are undertaken.

    THANKS - Agreed and that is being looked into as I post however I just wondered if anyone on this forum had faced a similar problem and/or an Engineer was willing to comment (without commitment) regarding the need to purchase the fan as well + why the pipe could not just be pushed back on to whence it came!
This discussion has been closed.
Meet your Ambassadors

🚀 Getting Started

Hi new member!

Our Getting Started Guide will help you get the most out of the Forum

Categories

  • All Categories
  • 354.4K Banking & Borrowing
  • 254.4K Reduce Debt & Boost Income
  • 455.4K Spending & Discounts
  • 247.3K Work, Benefits & Business
  • 604K Mortgages, Homes & Bills
  • 178.4K Life & Family
  • 261.5K Travel & Transport
  • 1.5M Hobbies & Leisure
  • 16K Discuss & Feedback
  • 37.7K Read-Only Boards

Is this how you want to be seen?

We see you are using a default avatar. It takes only a few seconds to pick a picture.