We'd like to remind Forumites to please avoid political debate on the Forum... Read More »
📨 Have you signed up to the Forum's new Email Digest yet? Get a selection of trending threads sent straight to your inbox daily, weekly or monthly!
Renewables: "talking 'bout my generation"
Options
Comments
-
Dr SPOON-er I'm assuming. 0.75 O's today:):)
145.6 kWh for Feb = 85% PVGIS:)16 Sanyo Hit 250s.4kWp SMA 3.8kWp inverter. SW roof. 28° pitch. Minimal shade. Nov 2011 install. Hybrid car. Ripple Kirk Hill. N.E Lincs Coast.0 -
Sterlingtimes wrote: »Well done, Andy, on out performing PVGIS.
I wonder whether I am suffering slightly for my tree shading. Time will tell.
I lose an hour in the morning this time of year due to the bungalow next door. I think from memory, by Mid March it isn't an issue.0 -
0.94 O's (3.73 kWh) Do not believe the sun came round our way today!
231.7 kWh against a PVGIS Estimate of 197 kWh 118%
13 Days below 5 kWh produced 33.6 kWh
So I made my estimate from 15 days3.795 kWp Solar PV System. Capital of the Wolds0 -
6.0kWh today brought my monthly total to 200.5KWh.
This is 117.9% of PVGIS.
Fingers crossed this trend follows into March, so I can achieve my self-imposed target of 4000 by the 10th. Target PVGIS for March is 10.5 per day....so technically should be doable.
C'mon Sun!! Show Yerself!4kw (16X250w Sharp). Samil Solar River 3680 TL inverter.
E.mids/SSE. 35 degree roof pitch, no shading.0 -
1.08 combined O's today..no spooning for me thankyou
Monthly total for feb
ESE 80kWh(105% PVGIS)
SSW 96kWh(102% PVGIS)
WNW 50kWh(104% PVGIS)
Bought 345kWh of electric(average 12kWh a day)
Bought 59 Units of gas
Bring on the summer, the sooner the better2 kWp SEbE , 2kWp SSW & 2.5kWp NWbW.....in sunny North Derbyshire17.7kWh Givenergy battery added(for the power hungry kids)0 -
Well down on PVGIS of 90.4 kWh, but I usually am in the winter months due to shading.
Feb 2015: 79.21 kWh
Feb 2014: 90.25
Feb 2013: 77.63
Feb 2012: 103.542kWp Solar PV - 10*200W Kioto, SMA Sunny Boy 2000HF, SSE facing, some shading in winter, 37° pitch, installed Jun-2011, inverter replaced Sep-2017 AND Feb-2022.0 -
Sterlingtimes wrote: »I wonder whether I am suffering slightly for my tree shading. Time will tell.
Rekon time will tell it's down to *rap weather....Dr SPOON-er I'm assuming. 0.75 O's today:):)
145.6 kWh for Feb = 85% PVGIS:)
Hmmm not looking good, at this moment in time;.....
My total for February was 46.16 O's as opposed to 53.56 O's for 2014: Today only managed 0.96 O's..:mad:.....
Edit: Wattson read....0.996 O's...;)2.5 kWp PV system, SSW facing, 45 Deg Roof. ABB Inverter, Monitor: 'Wattson'.
Reg. for FIT Nov 2011. "It's not what you generate; it's how you use it that matters". One very clean Vauxhall Diesel Sri, £30.00 Road Tax:
Definition of 'O's = kWh/kWp (kWh = your daily & accurate Generation figure) (kWp = the rated output of your PV Panels).0 -
System: M1 ESE 3.58kWp
Total generation: 126kWh (2014 129kWh)
Os (generation per kWp): 35.20kWh
System: M2 WNW 2.0kWp
Total generation: 48.9kWh (2014 50.9kWh)
Os (generation per kWp): 24.45kWh
Notes:
Overall 174.9kWh & 107% of target (2014 179.9kWh & 110%).
Import 155kWh.
Mart.Mart. Cardiff. 8.72 kWp PV systems (2.12 SSW 4.6 ESE & 2.0 WNW). 20kWh battery storage. Two A2A units for cleaner heating. Two BEV's for cleaner driving.
For general PV advice please see the PV FAQ thread on the Green & Ethical Board.0 -
Spoon me up, kids!!
2.52 kWh / 0.63 O's - No sun today apart from a sneaky 30 mins or so of hazy skies... otherwise a blanket of cloud of varying thickness!
Luckily it was enough to just nudge me over 100% PVGIS estimate for the month.
93.72 kWh generated against a target of 92.9 kWh - making it 100.9%4kWp system (Feb 2014) : 1.5 SW, 2.5 NE (16x Bisol BMO/250, Aurora Power-One UNO PVI-3.6 Inverter : pvoutput.org/list.jsp?id=299350 -
I lose an hour in the morning this time of year due to the bungalow next door. I think from memory, by Mid March it isn't an issue.2.5 kWp PV system, SSW facing, 45 Deg Roof. ABB Inverter, Monitor: 'Wattson'.
Reg. for FIT Nov 2011. "It's not what you generate; it's how you use it that matters". One very clean Vauxhall Diesel Sri, £30.00 Road Tax:
Definition of 'O's = kWh/kWp (kWh = your daily & accurate Generation figure) (kWp = the rated output of your PV Panels).0
Confirm your email address to Create Threads and Reply

Categories
- All Categories
- 351.1K Banking & Borrowing
- 253.2K Reduce Debt & Boost Income
- 453.7K Spending & Discounts
- 244.1K Work, Benefits & Business
- 599.2K Mortgages, Homes & Bills
- 177K Life & Family
- 257.5K Travel & Transport
- 1.5M Hobbies & Leisure
- 16.1K Discuss & Feedback
- 37.6K Read-Only Boards