I've asked someone round and this is what they have quoted:
Gutter and eves trays to front upper and eves trays to rear upper - 280
Turn flat roof into a pitched roof with tiles and new plastic barge boards - 450
scrape render to rear patch up, bond and then terrelean on all of the rear - 1500
Damp proof front and rear walls via injection damp proofing - 300
install 2 wall vents and repoint ridge tiles - 160
remove back boiler and install worchester boiler and 6 radiators - 2200
insulate all pipes in loft - 200
block up existing flues and fix stop tap - 300
skim 2 ceilings and make right plaster under sink and bottom of stairs - 400
electrics - change consumer unit, chop cooker cable into wall, make safe sockets and rener plus do periodic checks - 1000
install bathroom suite - 550
patch up floor in back room - 40
remove fire place in back room and make right finish - 580 including rubbish removal.
I think some of it seems a bit excessive, was wondering what you all thought?
Thanks for your help
Gutter and eves trays to front upper and eves trays to rear upper - 280
Turn flat roof into a pitched roof with tiles and new plastic barge boards - 450
scrape render to rear patch up, bond and then terrelean on all of the rear - 1500
Damp proof front and rear walls via injection damp proofing - 300
install 2 wall vents and repoint ridge tiles - 160
remove back boiler and install worchester boiler and 6 radiators - 2200
insulate all pipes in loft - 200
block up existing flues and fix stop tap - 300
skim 2 ceilings and make right plaster under sink and bottom of stairs - 400
electrics - change consumer unit, chop cooker cable into wall, make safe sockets and rener plus do periodic checks - 1000
install bathroom suite - 550
patch up floor in back room - 40
remove fire place in back room and make right finish - 580 including rubbish removal.
I think some of it seems a bit excessive, was wondering what you all thought?
Thanks for your help
:T:T :beer: :beer::beer::beer: to the lil one
:beer::beer::beer:

0
Comments
-
i don't think it's over the top the prices seem there , or there abouts , but i wouldn't have thought the removal of fireplace + make good is more than a days work , even if you have to hire a skip , could you insulate the pipes in loft yourself , it's easy to do ,, the electrics may seem a bit pricey , but it all depends on how much is being done0
-
Looks pretty cheap to me. Some of that is quite specialist stuff so is it all from the same person? Personally I'd rather get trades/specialists in than a general builder but thats your call.
Get 2 more quotes. And enquire about who is actually doing the work... i.e. I presume they have a plasterer for the plastering, and a gas safe engineer for the boiler?0 -
yeah its one person giving us the quote, but bringing several friends to do the main stuff. I think i'm going to get some more quotes to check:T:T :beer: :beer::beer::beer: to the lil one
:beer::beer::beer:
0
This discussion has been closed.
Confirm your email address to Create Threads and Reply

Categories
- All Categories
- 351.7K Banking & Borrowing
- 253.4K Reduce Debt & Boost Income
- 454K Spending & Discounts
- 244.7K Work, Benefits & Business
- 600.1K Mortgages, Homes & Bills
- 177.3K Life & Family
- 258.4K Travel & Transport
- 1.5M Hobbies & Leisure
- 16.2K Discuss & Feedback
- 37.6K Read-Only Boards