We’d like to remind Forumites to please avoid political debate on the Forum.
This is to keep it a safe and useful space for MoneySaving discussions. Threads that are – or become – political in nature may be removed in line with the Forum’s rules. Thank you for your understanding.
📨 Have you signed up to the Forum's new Email Digest yet? Get a selection of trending threads sent straight to your inbox daily, weekly or monthly!
The Forum now has a brand new text editor, adding a bunch of handy features to use when creating posts. Read more in our how-to guide
turning seperate garage into office
alocacoc
Posts: 155 Forumite
hi I have a prefab concrete garage at the bottom of my drive
its a little old but seems dry with no leaks etc
Id like to turn into office space on a budget
it has electric and is concrete walled/floored
so far Ive been told to build a wooden frame then plasterboard up that
what next
thanks for any help
its a little old but seems dry with no leaks etc
Id like to turn into office space on a budget
it has electric and is concrete walled/floored
so far Ive been told to build a wooden frame then plasterboard up that
what next
thanks for any help
0
Comments
-
If its only the walls you are doinig then the following applies:
Ok, assuming your wooden frame is up (and assuming you have spaced the studs 600mm apart you are ready for part B - Insulation, put Rockwool (brand name, any would suffice) between the studs. Then choose your boards wisely, I assume you cant plaster, therefore you will need "tapered edge boards" (They are the same price as normal plasterboard, I suggest 2400x1200x15mm boards. face the boards "upwards" Ie when board is stood up it should measure 1200 mm wide. Put a pencil mark right down the middle of the board (600mm from each edge, this is to know where to fix to the stud. Push board up to ceiling height and screw fix with "drywall screws" Make sure the width of the board is halfway across the right side stud (so you can get the next board on the stud) put a screw fixing in every 300mm up. When fixing the screw make sure it only just goes into the plasterboard paper without peircing the paper so the screw is only JUST indented. DO NOT board all the way to the floor leave approx 1 inch of the floor to stop any damp going up through the new wall (skirting board will hide this). Once you have fixed all of the boards it is a simple case of "tape & Jointing" Tape the joints all the way up the boards then it is a simple case of filling the indents where the two boards meet with jointing compound using a wide jointing knife. Also cover all of the screw heads with the same compound. Once The compound has gone hard simply sand (using fine sanding paper) until happy it is smooth with the boards. Once painted it will look as good as any office wall you have ever seen. Hope this makes sence!!!!
Good Luck0
This discussion has been closed.
Confirm your email address to Create Threads and Reply
Categories
- All Categories
- 354.3K Banking & Borrowing
- 254.4K Reduce Debt & Boost Income
- 455.4K Spending & Discounts
- 247.3K Work, Benefits & Business
- 604K Mortgages, Homes & Bills
- 178.4K Life & Family
- 261.5K Travel & Transport
- 1.5M Hobbies & Leisure
- 16K Discuss & Feedback
- 37.7K Read-Only Boards