Extension quote with full renovation - What do you think?

Basic_Bob
Posts: 2 Newbie
Hi,
I've now received planning permission so trying to get quotes. I live in London.
The extension is a double storey side and a single storey at the back with the first floor coming out 1 metre over the new gound floor extension. Total extension area is 63square metre. It will also be a complete refurbishment ie new roof, electrics plumbing with wet UFH on ground floor, double glazing etc. Total of 2 bathrooms.
First quote back £118,000.
I did prepare a detailed specification but I think this has scared a lot of builders I'm not sure why I think this way.
Any builders out there that don't prefer a detailed specification?
What are peoples gut reactions is too high, I am getting more quotes which I will post online?
I was told the quote is to start next month but if I was to start in 6 months time which is what I would prefer to do the pricing will be different as he says it will be higher, what do people think?
Do people think prices will go up in 6 months time? What do people think?
Thanks
I've now received planning permission so trying to get quotes. I live in London.
The extension is a double storey side and a single storey at the back with the first floor coming out 1 metre over the new gound floor extension. Total extension area is 63square metre. It will also be a complete refurbishment ie new roof, electrics plumbing with wet UFH on ground floor, double glazing etc. Total of 2 bathrooms.
First quote back £118,000.
I did prepare a detailed specification but I think this has scared a lot of builders I'm not sure why I think this way.
Any builders out there that don't prefer a detailed specification?
What are peoples gut reactions is too high, I am getting more quotes which I will post online?
I was told the quote is to start next month but if I was to start in 6 months time which is what I would prefer to do the pricing will be different as he says it will be higher, what do people think?
Do people think prices will go up in 6 months time? What do people think?
Thanks
0
Comments
-
price does not seem too high for the area.have sent you a pm0
-
If the guy can start next month (the job may last a while) this means he has little in the piepline.
I would read something in to this.
If they guy could fit you in soon for a smaller job that is different- most trades leave a couple of hours spare now and then to slot in speculative work.baldly going on...0 -
No more than £90,000 I would say0
This discussion has been closed.
Confirm your email address to Create Threads and Reply

Categories
- All Categories
- 351.7K Banking & Borrowing
- 253.4K Reduce Debt & Boost Income
- 454K Spending & Discounts
- 244.7K Work, Benefits & Business
- 600.1K Mortgages, Homes & Bills
- 177.3K Life & Family
- 258.4K Travel & Transport
- 1.5M Hobbies & Leisure
- 16.2K Discuss & Feedback
- 37.6K Read-Only Boards