Ready, steady… save!
You don’t need a chart to join in. Here are 2 ways to record your savings:
1. Cross it off
Pop a chart into your first post. Saved an amount? Cross it out! Read more »
£0.01 £0.02 £0.03
2. Write it down
Skip the chart and add updates to your first post. Read more »
“Another +£3 saved today. Go me!”
Use +£ before each new saving so it counts towards your total.
📨 Have you signed up to the Forum's new Email Digest yet? Get a selection of trending threads sent straight to your inbox daily, weekly or monthly!
Combi Boiler - Help!
rich1979_2
Posts: 13 Forumite
Hi
I'm having a new central heating system fitted to my house, and the plumber I'm using is proposing to install the 35kw Broag Remeha avanta plus combi boiler.
Are these any good? I see on here people always talking about the Worcester Bosh boilers. Is it worth paying a bit extra to get one of these in the long run??
Any advice greatfully received.
Many thanks...
0
Comments
-
Good morning: Broag has a good rep (Dutch company)....the Avanta plus is a small, light combi with 5 year warranty/stainless steel heat exchanger and is becoming more popular with RGIs....but remember, a boiler is only as good as its installation and annual servicing.
HTH
CanuckleheadAsk to see CIPHE (Chartered Institute of Plumbing & Heating Engineering)0 -
Thanks mate. Happy that the plumber is decent as he's done some work for me before. Just wanted to double check the boiler he's suggesting.
However, as you know your stuff, he's quoted £7500 (inc VAT) to install the following to a three storey terraced house that has all plumbing completely stripped out. We're in the South East. Does that seem about right?
· Run waste from kitchen sink position to rear of property along surface of internal wall (to be boxed in) and connect into existing soil stack .
· Run gas and water supplies under floor from respective control valves to rear of property to boiler position.
· Run hot and cold water supplies to kitchen sink, bath, basin, shower, 1st floor toilet and basement toilet and basin and run waste pipes from bathroom into soil stack along external wall from 1st floor.
· Excavate and join on to existing soil pipe under floor in existing basement w.c. and install plumbing to accommodate toilet and basin
· Supply and fit 35kw Broag Remeha avanta plus condensing combination boiler in purpose made boiler room also to accommodate plumbing for washing machine. (Boiler has 5 year parts and labour warranty)
· install programmer/room stat or programmable room stat (tba)
· Install full central heating system with sized radiators in all rooms each radiator to be fitted with a thermostatic and lockshield radiator valves. Supply and fit chrome towel radiator and chrome valves in bathroom.
· Fill, flush, test and commission boiler and heating system.
· Install standard bathroom suite and shower
Thanks..0 -
Sounds very reasonable is the vat at the new rate?
I would go for the Broag over a WB, although if it was my house I would look at a vaillant 937 or if there is good mains pressure and flow the unvented route would be my choice.Mine needed a new fan so that must be whats wrong with yours:D0 -
Good evening: I agree with Razor (again;))...I'd throw the Viessmann Vitodens 333 into the mix as well just to make it interesting. Make sure pipework is lagged (insulated) as appropriate...the OH uses 22mm/25mm and 15mm/25mm (Part L compliant) as this is an item often left off quotes to cut the bottom line.
HTH
CanuckleheadAsk to see CIPHE (Chartered Institute of Plumbing & Heating Engineering)0
This discussion has been closed.
Confirm your email address to Create Threads and Reply
Categories
- All Categories
- 356K Banking & Borrowing
- 255K Reduce Debt & Boost Income
- 456.3K Spending & Discounts
- 248.5K Work, Benefits & Business
- 606.2K Mortgages, Homes & Bills
- 179.1K Life & Family
- 264K Travel & Transport
- 1.5M Hobbies & Leisure
- 16.2K Discuss & Feedback
- 37.7K Read-Only Boards