Ready, steady… save!
You don’t need a chart to join in. Here are 2 ways to record your savings:
1. Cross it off
Pop a chart into your first post. Saved an amount? Cross it out! Read more »
£0.01 £0.02 £0.03
2. Write it down
Skip the chart and add updates to your first post. Read more »
“Another +£3 saved today. Go me!”
Use +£ before each new saving so it counts towards your total.
We’d like to remind Forumites to please avoid political debate on the Forum.
This is to keep it a safe and useful space for MoneySaving discussions. Threads that are – or become – political in nature may be removed in line with the Forum’s rules. Thank you for your understanding.
Comments
-
For those who are getting confused... MCB (Miniature Circuit Breaker) The modern equivalent to a fuse, but more sensitive. Designed to disconnect the power in case of overload. RCD (Residual Current Device) A device designed to detect miniscule currents (usually leaking to earth) and disconnect the power in milliseconds…
-
10 years is a MAXIMUM that assumes nothing changes in that time. Installations should be inspected at any point where there is an alteration to the installation, a change of tenant, or where the intallation begins to show signs of wear'n'tear. As for RCDs ... You may have a series of MCBs and one RCD protecting everything…
-
For more information on Part P and what can and cannot be done and what constitutes a "Dwelling" read the Building Regulations Approved Document P, (Don't Panic! - it's not all legal and/or technical jargon) which can be found at this address…
-
Surprisingly .... NONE! In an NICEIC "Approved Enterprise" (they do not have 'members') it is the Enterprises QS (Qualified Supervisor) who is responsible for deciding on the suitability of operatives. The QS Must have 2381 & 2391 (not necessarily recent and/or up-to-date, but the Part P Schemes will not tell you this!)…
-
Firstly, if the firm testing charges £50 or less or is only there an hour, then the report you get is likely to be incomplete, inaccurate, or (more likely) both! Bonding to incoming Gas, Oil and Water etc. is mandatory unless the water is in plastic pipe. The cost varies depending on difficulty, firm, region, etc. and so…
-
They do NOT have to be mains powered. However, mains powered with battery back-up and interlinked IS recommended.
-
DC is more dangerous than AC. The heart is a series of muscles that contract in a specific way. You put a DC current across those muscles and the 'lock up' (sorry, not a very technical explanation) and stop pumping. Therefore AC frequency is not a factor. If the muscles are damaged by the current, the heart can never…
-
Voltage is not the killer. It is current flow that kills. Not many people realise that only 120mA is FATAL. That's a fraction of an amp.
-
The arcing you see is due to the size or type of load on the switch (what type of light and/or how many) or it could be a faulty switch. It needs fixing, whatever the cause. As for the length of insurance, I think it varies between registration bodies but is about 5yrs minimum. Call you electricians scheme provider and ask…
-
Actually, an install with no neutral would be more like a car that had been sliced down the middle and the left-hand half taken away as Neutral forms part of the circuit and is not a safety device while earthing and brakes both are.
-
Can anyone explain how fitting a hot water cylinder jacket will save a life? The car analogy is fine up to a point, but to suggest that an install without earth bonding is not unsafe is downright ludicrous. To use you own classic car analogy, would you drive a 1960s Merc that had no brakes? Periodic Inspection Reports…
-
Wrong. BS7671 (IEE Wiring Regulations) have been around in on form or another since 1882. We are currently upto the 17th Edition. Part P of the building regulations is a completely different issue. Apart from the fact that (as mentioned above) the extensions leads would be visible and easily maintainable, they are…
-
at the time of day, I'd expect to charge (or pay) at least £40 plus parts so that is a fair price - and no, I'm not a plumber.
-
not a bad price - esp. if he is making good his own chases
-
Ahhhh. If you learn something new each day, then the day is never wasted :)
-
... and it is a lot cheaper than the other works mentioned. At the end of it, you should know what needs doing.
-
I assume by tanking you mean trunking? Anyway.... New work (and MOVING a socket counts as new work) is required to meet current regs. Current regs (probably) require an RCD in this case (there ARE exceptions) Therefore, if your current Consumer Unit does not have an RCD covering the circuit in question then you MAY need a…
-
...ignored the fact that the enclosure on Dual RCD boards is more expensive than a 'standard' enclosure. You are missing the point, we are comparing complete Consumer Units rather than contents. That's funny, because all the professional electricians I speak to prefer this method. These "sparky forums" wouldn't be places…
-
You are looking at the most expensive brands (Contactum have gone bust btw) which is never gonna work out. And I said 'comparable' not 'identical'. The price differences are not as big as you are making out. For a start, you are quoting prices for 2xRCD+10xMCB rather than a Dual RCD Consumer Unit.
-
No, I actually mean that a new Consumer Unit with RCBOs on each circuit is comparable in price to a Consumer Unit with twin RCDs and MCBs for each circuit. The cost of RCBOs has dropped significantly in the past 12 months.