Ready, steady… save!
You don’t need a chart to join in. Here are 2 ways to record your savings:
1. Cross it off
Pop a chart into your first post. Saved an amount? Cross it out! Read more »
£0.01 £0.02 £0.03
2. Write it down
Skip the chart and add updates to your first post. Read more »
“Another +£3 saved today. Go me!”
Use +£ before each new saving so it counts towards your total.
We’d like to remind Forumites to please avoid political debate on the Forum.
This is to keep it a safe and useful space for MoneySaving discussions. Threads that are – or become – political in nature may be removed in line with the Forum’s rules. Thank you for your understanding.
Comments
-
If you have structural engineer survey, ask a few builders companies in your area to estimate the works
-
Looks like the builders should have ;)free trial period;)
-
What kind of stone is that? If it is marble the price is too low.
-
It is very fair price as for London, but could be some extra depending of the counsil (skip, parking, congestion)
-
I would be happy to employ the builders for the price.
-
It is a good price for the tiling, but do not forget to ask the tiler if you need any other works before tiling.
-
Maybe in terms of price for the units, but not in terms of the delivery, the same with the Homebase.
-
If the waste pipe is just outside the wall, it should not be too much (a few hundred pounds) to drill the wall, install the pipe connect to the outside pipe (hope it is plastic), fit the toilet. The toilet decoration itself is much more.
-
Hope you live outside congestion zone, otherwise you hardly find someone for the price.;)
-
Ask at least three builders to provide quotes, also local fitters supposed to be cheaper than the national monsters.
-
Hi, be careful with B&Q: quite often they are failing to deliver the ordered unites and for the redelivery they would ask you to wait up to 4 weeks. - Ask at least three builders to provide quotes. - Talk to the builder's previous customers.
-
1 day is a good speed for a man to install 5 doors. For 8 working hours 5 doors installation is 1 hour 36 minutes for a door. :beer:
-
If the project is up to 5k 30% OK. But if it is more I have doubts if you would be paid 30%.
-
Nice job, good luck promoting the company that done the tiling.
-
Normally you would be asked to sign a cheque of 15 - 25% of the estimated price on the starting day and than by installments as parts of the project are completed.
-
Is it just tiling? any preparation works needed? what are your walls/floor conditions? What kind of tiles: Ceramic? Natural stone? Size of the tiles? Mozaic? Who would supply the materials?
-
To have rough price idea, use this building cost estimator. 5k looks too much if you not thinking of installing wireless waterproof TV with dolby surround system, granit or marble tiling in the bathroom etc.
-
Please, keep us informed about the results of the works: the quality of the jos is the same cheap as the quote?
-
What about materials? Who would supply them?