Ready, steady… save!
You don’t need a chart to join in. Here are 2 ways to record your savings:
1. Cross it off
Pop a chart into your first post. Saved an amount? Cross it out! Read more »
£0.01 £0.02 £0.03
2. Write it down
Skip the chart and add updates to your first post. Read more »
“Another +£3 saved today. Go me!”
Use +£ before each new saving so it counts towards your total.
We’d like to remind Forumites to please avoid political debate on the Forum.
This is to keep it a safe and useful space for MoneySaving discussions. Threads that are – or become – political in nature may be removed in line with the Forum’s rules. Thank you for your understanding.
drive edging
quinns2003
Posts: 200 Forumite
Hi guys
i'm having a dropped kerb put in, but before they can do it I need to put something in between the pavement and my property to keep my chippings off the pavement whats best to use as im going to be driving over it and is it easy to do.. thx
i'm having a dropped kerb put in, but before they can do it I need to put something in between the pavement and my property to keep my chippings off the pavement whats best to use as im going to be driving over it and is it easy to do.. thx
0
Comments
-
www.wickes.co.uk/Marshalls-Path-Edging-Stone-600x150x50mm
something like that you need to put in for a driveway separation between the public path and your drive i would go for a flat top version
is it easy to fit fairly easy if you are good at DIY but what i would do is ask the guys doing the drop kerbs to do it
they will need to drop the kerbs and concrete them in leave this over night to dry and then next day come back to make good the pavement
it will be easy for them to do it at the same time as the drop kerbs0 -
thx for the reply.. that's what I thought but they say (the woman on the phone) that it has to be done before their guys do it.. do I lay them in concrete or sand and how far do I dig down ?0
-
you would set them in concrete, the edgings that i linked to are about 2 inch wide by 6 inch deep so you would dig out 8 to 10 inches fill the trench with about four inches of concrete and tap the edging down into the concrete to the required finish level, and then form the concrete up to about half way up the edging and then finish up to it with the path on one side and the drive on the other
who is doing the drop kerbs for you?0 -
sounds easy

ETM groundworks are doing it but I had to finish internal works as per the council excavation liscense0 -
they don't want my chippings all over the pavement/road.. I don't really think the edging is going to stop this but its what they want0
-
have you looked at eco grid or the like lay the edgings and then for the first 500mm back from the path edgings towards the house lay a row of eco grid
put sub base to within 50mm of the top of the edging and then the 50mm eco grid filled with gravel, this will stop the gravel moving about to much in the first 500 mm nearest the council pavement
www.ecogridpaving.co.uk0 -
will have a look thx
0 -
you tube ecogrid
you will see at the edges they have used like a cobble set as the separation between the drive and the pavement, it looks nice but more expensive than the edgings i mentioned earlier
using ecogrid for a gravel drive makes it a more solid surface and it wont move as much as loose laid gravel, it would be expensive to use on the whole drive but just the first 300 mm or 600 mm back from the pavemnt will keep gravel spill to the minimum0
This discussion has been closed.
Categories
- All Categories
- 356K Banking & Borrowing
- 255K Reduce Debt & Boost Income
- 456.3K Spending & Discounts
- 248.5K Work, Benefits & Business
- 606.3K Mortgages, Homes & Bills
- 179.1K Life & Family
- 264.1K Travel & Transport
- 1.6M Hobbies & Leisure
- 16.2K Discuss & Feedback
- 37.7K Read-Only Boards