Ready, steady… save!
You don’t need a chart to join in. Here are 2 ways to record your savings:
1. Cross it off
Pop a chart into your first post. Saved an amount? Cross it out! Read more »
£0.01 £0.02 £0.03
2. Write it down
Skip the chart and add updates to your first post. Read more »
“Another +£3 saved today. Go me!”
Use +£ before each new saving so it counts towards your total.
We’d like to remind Forumites to please avoid political debate on the Forum.
This is to keep it a safe and useful space for MoneySaving discussions. Threads that are – or become – political in nature may be removed in line with the Forum’s rules. Thank you for your understanding.
Architect Services - bill
aliasojo
Posts: 23,053
Forumite
Can I just run something past you knowledgeable peeps please? We got an architect to draw up some plans to submit for building regs approval. It wasn't for anything major just moving a door/window to where the other used to be, knocking down a short internal non-supporting wall and moving the boiler (but without moving the flue exit - boiler was just getting moved closer).
When he came out to look at the job, he did say he was busy but he also said he could do something in a couple of weeks. In actual fact it was (at least) 6 weeks before we saw him again and he brought a young foreign exchange student assistant to help measure up.
It was weeks later before we heard anymore and I was having to phone regularly to ask him to please attend to it. I said at that time it would have been more honest of him if he'd told us he was 'too' busy to do our job rather than just busy and we could have gone elsewhere. Eventually we got our plans and submitted them but the architect had left out a simple thing and the application was refused.
I phoned the architect about this who said he could redo with the missed bit but he was busy and it would take weeks so I told him not to bother and the building officer himself showed me what to do to cover what they wanted, so I dealt with it myself.
When my application got passed, I found out via the building regs dept a good week before the architect phoned me to tell me.
The architect never sent me the paperwork that the building regs dept had sent out, so when we started the work we couldn't submit the correct form. Thankfully the building regs officer accepted the info by phone.
I phoned the architect to ask him to send the paperwork out and also to bill me but heard nothing until 7 months later when he then sends me the building regs paperwork and a bill for £1330. He had billed his assistant's hours @ £25/hr and his at £50/hr. He said his student assistant hadn't managed to do much on the job so he had a fair bit to do himself in order to draw the plans up.
I was quite shocked tbh. I feel he has not provided me with a good service (he's a one man firm and he usually handles work for the local housing authority and he does a lot of extension and new build work so our job was pretty insignificant and I think he treated it as such).
He knew all along that we needed the job to be dealt with quickly, he also knew I was unhappy at his tardiness with everything so I'm sure it came as no surprise when I haven't been too prompt at putting a cheque in the post yet.
I'm in two minds whether to write to him and detail my unhappiness at the way in which he dealt with us but before I decide what to do, I need to know if the amount he's asking seems reasonable?
He did 2 site visits (the first to talk about what needed done and the second to measure up), the drawings for the application and he also submitted the application to the council on our behalf.
I know this is a piece of string type question but would this kind of cost be in the ballpark?
When he came out to look at the job, he did say he was busy but he also said he could do something in a couple of weeks. In actual fact it was (at least) 6 weeks before we saw him again and he brought a young foreign exchange student assistant to help measure up.
It was weeks later before we heard anymore and I was having to phone regularly to ask him to please attend to it. I said at that time it would have been more honest of him if he'd told us he was 'too' busy to do our job rather than just busy and we could have gone elsewhere. Eventually we got our plans and submitted them but the architect had left out a simple thing and the application was refused.
I phoned the architect about this who said he could redo with the missed bit but he was busy and it would take weeks so I told him not to bother and the building officer himself showed me what to do to cover what they wanted, so I dealt with it myself.
When my application got passed, I found out via the building regs dept a good week before the architect phoned me to tell me.
The architect never sent me the paperwork that the building regs dept had sent out, so when we started the work we couldn't submit the correct form. Thankfully the building regs officer accepted the info by phone.
I phoned the architect to ask him to send the paperwork out and also to bill me but heard nothing until 7 months later when he then sends me the building regs paperwork and a bill for £1330. He had billed his assistant's hours @ £25/hr and his at £50/hr. He said his student assistant hadn't managed to do much on the job so he had a fair bit to do himself in order to draw the plans up.
I was quite shocked tbh. I feel he has not provided me with a good service (he's a one man firm and he usually handles work for the local housing authority and he does a lot of extension and new build work so our job was pretty insignificant and I think he treated it as such).
He knew all along that we needed the job to be dealt with quickly, he also knew I was unhappy at his tardiness with everything so I'm sure it came as no surprise when I haven't been too prompt at putting a cheque in the post yet.
I'm in two minds whether to write to him and detail my unhappiness at the way in which he dealt with us but before I decide what to do, I need to know if the amount he's asking seems reasonable?
He did 2 site visits (the first to talk about what needed done and the second to measure up), the drawings for the application and he also submitted the application to the council on our behalf.
I know this is a piece of string type question but would this kind of cost be in the ballpark?
Herman - MP for all!
0
Comments
-
Think I might have posted on the wrong board?

(I just figured there would be more 'relevant' peeps on this one.)
Herman - MP for all!
0 -
Does that include the council fees too, or did you pay the council directly?
Did you get an estimate from the architect before appointing him, and did it bear any relation to the final bill?
I think, to be honest, getting an architect in to do a small building regs job was overkill - architects are great when you need design input, best use of space, adding flair etc, but they are expensive and are not necessarily great at the technical stuff anyway.
You'd probably have paid less than half if you'd found an architectural technician, or got quotes from surveyors or even the local 'plans drawer' (who can often be quite good). It's the building control who ultimately OK the plans so it's the sort of job that can even be tackled DIY.
Any dispute that you have with them over the bill would be for their appalling service, not the level of the fees which are probably within tolerance for a qualified architect and staff doing their job.0 -
No, the architect asked us to write a seperate cheque for the council - £100 for the building regs application fee.
We didn't get an estimate, it was just an agreement to work on an hourly rate basis. (At that point we were under the impression this was a small job which would take him a few hours max. :rolleyes: )
I was rather naive when we started this, I am more understanding of the process now and would without doubt do things differently next time round. It's all a learning curve.
I will pay his bill in full, but I may write to him first just to let him know how busy I am and I will attend to it in good time. :rolleyes:Herman - MP for all!
0 -
Sounds like the architect has made a right mess of this, then proceeded to charge you top dollar for the work. Is the architect actually a bona-fide qualified architect, ie. a member of RIBA? WillowCat is right - small householder stuff is best left to a local plansmith. Charges are extremely variable - in our area I know of one guy who will do you a decent set of plans for £300+VAT and do whatever amendments are necessary to get them through, yet I know of a rather poor Architectural Technican who draws in ink and charges a minimum of £1000+VAT for every job.
Building Control don't usually refuse things outright without giving the applicant or agent an opportunity to rectify the problem. In the first instance, after vetting the plans and finding something is missing they will request an amendment and give the applicant time to amend their plans. They can also issue a "conditional approval" for minor detail that is missing. If an applicant doesn't respond to the request for an amendment and the application is going to go out of time then, and only then, will they refuse it. I would contact the BC office and ask if any amendments were requested and dates the etc - this will all be in their computer system. I would then write to architect and ask him to consider reducing his fee because of his failure to do the job properly.
You didn't actually need to apply for the boiler work because you would have to have the work done by CORGI registered gas fitter who would report the work under the Competent Persons Scheme.0 -
The architect is well established and well known in these parts. I have no doubts about his qualifications or ability....I just think our job wasn't lucrative enough for him and wasn't worthy of his time or attention tbh so he wasn't overly concerned about giving us a good service.
I deeply regret contacting him in the first place but what's done is done.
I believe the architect DID receive notification from the Building Control about the problem but I had already found it all out by phone from BC and spoke to the architect about it before he'd received the letter from them.
That's when he said he had no time to attend to it and it would be weeks before he could do anything. So I ammended the details myself and supplied pictures of existing and proposed new matters which BC accepted.
As for the boiler thing, I queried this with BC before firming up our plans and was told I DID need to get building regs approval for this. A new installation didn't require this but re-siting the boiler did.
We're in Scotland btw in case it's different policies etc.
I think I may write to him outlining our unhappiness, detailing the times where I felt we were let down in terms of good service and ask him to reduce his bill as a gesture of goodwill and see what happens.
Is that reasonable?Herman - MP for all!
0 -
Tell him he is takign the p**s and make a counter-offer. Maybe £500. He has done a poor job and should not be paid top whack for it. £25 p/h for some kid to do some measuring? WOW! He was probably paying him £4 of that. I think this guy is taking the p**s to be honest.0
This discussion has been closed.
Categories
- All Categories
- 356K Banking & Borrowing
- 255K Reduce Debt & Boost Income
- 456.3K Spending & Discounts
- 248.5K Work, Benefits & Business
- 606.3K Mortgages, Homes & Bills
- 179.1K Life & Family
- 264.1K Travel & Transport
- 1.6M Hobbies & Leisure
- 16.2K Discuss & Feedback
- 37.7K Read-Only Boards