Plug in solar question

2»

Comments

  • QrizB
    QrizB Posts: 24,967
    10,000 Posts Fifth Anniversary Photogenic Name Dropper
    Forumite

    The guidance I have seen is you are only allowed to changing things like switch and sockets.

    Here is the IET's FAQ to Part P of the Building Regs.

    https://electrical.theiet.org/bs-7671-18th-edition-wiring-regulations/building-regulations/part-p-england-and-wales/frequently-asked-questions/

    You're "allowed" to do any electrical work provided it complies with Part P (which in turn means complies with BS7671). For more major works you need to notify your local Building Control and pay their fee.

    Notifiable work consists of:

    • The installation of a new circuit
    • The replacement of a consumer unit
    • Any addition or alteration to an existing circuit in a special location

    The fee is not trivial; this page from Stockport Council shows you're looking at almost £2k all in.

    Using a professional electrician means they deal with all the Building Control aspects and (by virtue of being certificated) get a reduction in the BC fees.

    N. Hampshire, he/him. Octopus Intelligent Go elec / Fuse gas / Vodafone BB / iD mobile. Kirk Hill Co-op member.
    2.72kWp PV facing SSW installed Jan 2012. 11 x 247w panels, 3.6kw inverter. 37 MWh generated, long-term average 2.6 Os.
    Economy 7 cap explainer. Gas vs E7 vs peak elec heating costs, Ecoflow Stream, Best kettle :-)
  • sheenas
    sheenas Posts: 571
    500 Posts Second Anniversary Name Dropper
    Forumite
    edited 27 May at 3:06PM

    So we can safely ignore most DIY changes as it costs 2k for a certificate? It's worth noting the Electrician will self cert, when I say electrician that is someone who is a member of NICEIC, NAPIT, or ELECSA.

    The government may have guidance soon on suitable area for battery, i.e. not in the bathroom we will have to see what advised.

  • Qyburn
    Qyburn Posts: 4,390
    Sixth Anniversary 1,000 Posts Name Dropper
    Forumite

    Of relevance to the subject, plug in solar, that IET page indicates that adding additional sockets to an existing circuit is not notifiable. I can't see any exception there for an external socket.

  • sheenas
    sheenas Posts: 571
    500 Posts Second Anniversary Name Dropper
    Forumite
    edited 27 May at 4:49PM

    I think we have cover this in the 3 or 4 posts, but we not add anything and therefore nothing is notifiable as things stand. We are plug in something just like a EV. The only difference being is that the device is designed to send power into the home. Added outside sockets is another topic, most will use an existing socket to keep costs down.

    The IET's BS 7671 wiring regulations and G98 grid code have been updated to permit these devices to connect to domestic circuits without needing a qualified electrician to sign off on the work.

    Currently changing a socket to a fused spar is allowable, but if you don't feel comfortable by all means either wait or get a sparky.

    The Department for Energy Security and Net Zero (DESNZ) commissioned safety studies to assess the rollout of truly plug-in units, expected soon. This will clear the final hurdles around the use a standard plug.

  • Heedtheadvice
    Heedtheadvice Posts: 3,120
    Part of the Furniture 1,000 Posts Name Dropper
    Forumite
    edited 28 May at 11:47AM

    Very Interesting what you post Sheenas and Qrizb

    It is news to me that it is now 'legal' under bs7671 because of amendments made in April and not needing a competent person ( I read between the lines and roughly paraphrase what is written, I.e. how the uninitiated might read it.

    There are still several things that must be complied with and even the website https://www.pluginsolarexplained.co.uk/bs-7671-amendment-4/ shows that it is not just a simple case of plug in or making circuit changes and even the IET forum raises lots of questions.

    Rather than quoting pages and sections and documents in isolation and giving opinions we need an overview of it all otherwise we might risk readers assuming everything is covered and we just go ahead! At present we are collectively giving out potentially confusing and limited information ( sometimes at odds with other posts ) in our aim to help.

  • Qyburn
    Qyburn Posts: 4,390
    Sixth Anniversary 1,000 Posts Name Dropper
    Forumite

    Currently changing a socket to a fused spar is allowable,

    That would not be notifiable, so could be done DIY by a competent person. But a fused spur wouldn't necessarily be compliant for connection of a generation source.

★ ★ ★ Meet your Ambassadors

🚀 Getting Started

Hi new member!

Our Getting Started Guide will help you get the most out of the Forum

Categories

  • All Categories
  • 355.7K Banking & Borrowing
  • 254.9K Reduce Debt & Boost Income
  • 456.1K Spending & Discounts
  • 248.2K Work, Benefits & Business
  • 605.8K Mortgages, Homes & Bills
  • 179K Life & Family
  • 263.6K Travel & Transport
  • 1.5M Hobbies & Leisure
  • 16.2K Discuss & Feedback
  • 37.7K Read-Only Boards

Is this how you want to be seen?

We see you are using a default avatar. It takes only a few seconds to pick a picture.