Solar: DNO confirmation?

I had my solar panels hurriedly installed in March 2019, just before the end of the FIT scheme. Recently I looked back at the paperwork: MCS certificate, yes, DNO confirmation No.  What I do have is a copy of a form G83/2 SSEG INSTALLATION COMMISSIONING CONFIRMATION.  This tells the DNO that my installation complies with the requirements of G83/2 and my system has equipment "type tested" for 3.68 kW; all part of some sort of self-certification process it seems.  Is this sufficient?
Reed

Comments

  • Petriix
    Petriix Posts: 2,293 Forumite
    Ninth Anniversary 1,000 Posts Photogenic Name Dropper
    I had my solar panels hurriedly installed in March 2019, just before the end of the FIT scheme. Recently I looked back at the paperwork: MCS certificate, yes, DNO confirmation No.  What I do have is a copy of a form G83/2 SSEG INSTALLATION COMMISSIONING CONFIRMATION.  This tells the DNO that my installation complies with the requirements of G83/2 and my system has equipment "type tested" for 3.68 kW; all part of some sort of self-certification process it seems.  Is this sufficient?
    I've only got a G83 (2017 installation). I think that's all that was required under the old FIT scheme. I'll find out soon enough as I'm in the process of switching from FIT exports to Outgoing Octopus. 
  • That's exactly what I thought I might want to do at some point in the future.  Please let us know how you get on.
    Reed
  • I had my solar panels hurriedly installed in March 2019, just before the end of the FIT scheme. Recently I looked back at the paperwork: MCS certificate, yes, DNO confirmation No.  What I do have is a copy of a form G83/2 SSEG INSTALLATION COMMISSIONING CONFIRMATION.  This tells the DNO that my installation complies with the requirements of G83/2 and my system has equipment "type tested" for 3.68 kW; all part of some sort of self-certification process it seems.  Is this sufficient?
    I had my system installed back in 2010 and the installers didn't notify the DNO so I had to retrospectively complete a G98 Form B whereupon they sent me a letter informing me that I could connect my micro-generation unit to their distribution system.

    The letter was accepted by Octopus to enable me to switch from deemed to negotiated export.
Meet your Ambassadors

🚀 Getting Started

Hi new member!

Our Getting Started Guide will help you get the most out of the Forum

Categories

  • All Categories
  • 350.5K Banking & Borrowing
  • 252.9K Reduce Debt & Boost Income
  • 453.3K Spending & Discounts
  • 243.5K Work, Benefits & Business
  • 598.2K Mortgages, Homes & Bills
  • 176.7K Life & Family
  • 256.7K Travel & Transport
  • 1.5M Hobbies & Leisure
  • 16.1K Discuss & Feedback
  • 37.6K Read-Only Boards

Is this how you want to be seen?

We see you are using a default avatar. It takes only a few seconds to pick a picture.