We’d like to remind Forumites to please avoid political debate on the Forum.
This is to keep it a safe and useful space for MoneySaving discussions. Threads that are – or become – political in nature may be removed in line with the Forum’s rules. Thank you for your understanding.
📨 Have you signed up to the Forum's new Email Digest yet? Get a selection of trending threads sent straight to your inbox daily, weekly or monthly!
Standard DNO timing?
Jonboy1889
Posts: 168 Forumite
Can anyone give an idea of how long the standard DNO form takes to come back for system 3.6kw?
0
Comments
-
I assume the forum software got confused and that should be < 3.6kW?In my case, National Grid (formerly Western Power) responded to my installers G98 with a PDF letter in an email within a day. I don't know exactly when the installer submitted it but I received it 24 hours after commissioning, about an hour after I'd paid.This was last October3.6 kW PV in the Midlands - 9x Sharp 400W black panels - 6x facing SE and 3x facing SW, Solaredge Optimisers and Inverter. 400W Derril Water (one day). Octopus Flux1
-
A solar PV system with an inverter limit of 3.86kW or less per phase does not need DNO approval. The installer needs to notify the DNO once the array has been installed. A DNO acknowledgement is needed by the supplier to obtain an export MPAN.Jonboy1889 said:Can anyone give an idea of how long the standard DNO form takes to come back for system 3.6kw?1 -
Thanks- that was what I meant- how long for the DNO acknowledgement to arrive?[Deleted User] said:
A solar PV system with an inverter limit of 3.86kW or less per phase does not need DNO approval. The installer needs to notify the DNO once the array has been installed. A DNO acknowledgement is needed by the supplier to obtain an export MPAN.Jonboy1889 said:Can anyone give an idea of how long the standard DNO form takes to come back for system 3.6kw?0 -
It varies by DNO.Jonboy1889 said:
Thanks- that was what I meant- how long for the DNO acknowledgement to arrive?[Deleted User] said:
A solar PV system with an inverter limit of 3.86kW or less per phase does not need DNO approval. The installer needs to notify the DNO once the array has been installed. A DNO acknowledgement is needed by the supplier to obtain an export MPAN.Jonboy1889 said:Can anyone give an idea of how long the standard DNO form takes to come back for system 3.6kw?0
Confirm your email address to Create Threads and Reply
Categories
- All Categories
- 352.3K Banking & Borrowing
- 253.6K Reduce Debt & Boost Income
- 454.3K Spending & Discounts
- 245.3K Work, Benefits & Business
- 601.1K Mortgages, Homes & Bills
- 177.5K Life & Family
- 259.2K Travel & Transport
- 1.5M Hobbies & Leisure
- 16K Discuss & Feedback
- 37.7K Read-Only Boards