Solar panels and cancellation of your FIT by Ofgem
Options
Comments
-
I'm out of this discussion, too many inconsistencies in the story.
Your panels installed in 2016(4kwp) cannot be getting £1000 in FiT payment per year.
Sorry.. this whole thing looks more like confirmation bias.
“Don't raise your voice, improve your argument." - Desmond Tutu
System 1 - 14 x 250W SunModule SW + Enphase ME215 microinverters (July 2015)
System 2 - 9.2 KWp + Enphase IQ7+ and IQ8AC (Feb 22 & Sep 24) + Givenergy AC Coupled inverter + 2 * 8.2KWh Battery (May 2022) + Mitsubishi 7.1 KW and 2* Daikin 2.5 KW A2A Heat Pump1 -
Reed_Richards said:jasee said:Interesting that you can limit your export, I've not heard of that. I can't see the point.
Hmm. Didn't know this, so theoretically, you could export almost all the output to your electricity supplier?
0 -
I think you've more or less exhausted this here. On the face of it, there are a few facts that need to be relayed to OFGEM, whoever and if they don't play ball then go to the small claims court, on the fact of it they are:
1. Intent - both parties intended to enter into this contract and there was an agreement
2. You provided the certificate and were accepted on to the scheme, they were supposed to do the requisite checks and have accepted you onto the scheme, only identifying the issue 6 years later - unacceptable I would argue
3. No ability to rectify and inflexible, think the courts will take a dim view of you not being allowed to correct the issue especially as they failed to do the correct checks and allowed you to participate in the scheme for 6 years before an issue was identified.
4. Conduct - both parties acted as if they intended to be bound by the agreement and have done so for 6 years, for one to back out now based on their failure to ensure requisite due diligence would go against them.
You should clearly state your case, advise them you are willing to get a certificate now, at your cost, to rectify this issue and if they refuse then take them to court. It will cost you £80 and you have everything to gain. The failure was not yours, but of two other parties, one no longer exists but the other does and is capable of resolving this matter but chooses not to.2 -
jasee said:AFAIK FIT payments are linked to the current price of electricity not directly of course but from what I can recall they follow it?https://www.ofgem.gov.uk/publications/feed-tariff-fit-tariff-table-1-april-2022
That still wouldn't get your FIT back as the scheme is now closed.It woul of course be nice if my installer was still around. I'd get him to renew his membership of RECC, maybe, only maybe I'd then be able to get a new MCS certificate and maybe only maybe my electricity company would maybe only maybe allow me to resume .payments if maybe only maybe Ofgem gave me a FID.jasee said:But failing that my redress is against my electricity company. Who have stopped paying me for that which they have been paying me for six years. In that respect nothing has chanbed
The FIT scheme requires a MCS-certified system. You don't have one and so you're not supplying what the FIT scheme requires. I can't see that they have any obligation to pay you anything.I don't have a contract (according to Ofgem and MCS) their rules are not the rules of a contract. A contract is about supplying something to somebody and getting paid for it. I am still doing that, just they are not now paying what they have been paying for for the last six yearsispookie666 said:Your panels installed in 2016(4kwp) cannot be getting £1000 in FiT payment per year.A typical 4kWp array generating 4000kWk/yr would earn £333.80 per year.I'm out of this discussionOP, if you intend to take this beyond complaining to strangers on the internet, you need proper legal advice. If not contract law then public law.N. Hampshire, he/him. Octopus Intelligent Go elec & Tracker gas / Vodafone BB / iD mobile. Ripple Kirk Hill member.
2.72kWp PV facing SSW installed Jan 2012. 11 x 247w panels, 3.6kw inverter. 34 MWh generated, long-term average 2.6 Os.Not exactly back from my break, but dipping in and out of the forum.Ofgem cap table, Ofgem cap explainer. Economy 7 cap explainer. Gas vs E7 vs peak elec heating costs, Best kettle!1
Confirm your email address to Create Threads and Reply

Categories
- All Categories
- 351K Banking & Borrowing
- 253.1K Reduce Debt & Boost Income
- 453.6K Spending & Discounts
- 244K Work, Benefits & Business
- 599K Mortgages, Homes & Bills
- 176.9K Life & Family
- 257.4K Travel & Transport
- 1.5M Hobbies & Leisure
- 16.1K Discuss & Feedback
- 37.6K Read-Only Boards