Another typical July 23 day.
3.37 O's3.795 kWp Solar PV System. Capital of the Wolds2 -
Disappointing end to the month.
2.01 O's
103.5% of PVGIS
2nd worst July out of 10.
3.795 kWp Solar PV System. Capital of the Wolds2 -
1.7 O’s here today.
July total 444.5 kWh.
Lowest July 2020 422.9 kWh.
Best July 2013 560 kWh.😲16 Sanyo Hit 250s.4kWp SMA 3.8kWp inverter. SW roof. 28° pitch. Minimal shade. Nov 2011 install. Hybrid car. Ripple Kirk Hill. N.E Lincs Coast.2 -
Awful day again, 0.8 & 0.288 O's worst day since begging of March! July total 81.46% of estimated PVGIS,100+ kWh's less than July last year2 Separate arrays, 7 x JASolar 380w panels (2.66kWp) south facing, 4 x JASolar 380w panels (1.52kWp) east facing, 11 x Tigo optimizers & cloud, Growatt SPH5000, Growatt 6.5kWh Hybrid battery (Go-live 01/12/21) - Additional reporting via Solar Assistant.1
-
I said I'd come back for the month end figures.
July has been a dreadful month: 91% PVGIS - that's like missing 3 days entirely; 469kWh or 105.8 O's.
Compare that with April: 102% PVGIS, 480kWh, 108.2 O's
And to cap it all yesterday was the worst since 28 March.1 -
Poor day to end a poor month: 1.77 O'sJuly ended at 85% of PVGIS estimate and 80% of July last year.On the positive side, at least we haven't had heatwaves, droughts and wild fires.6.4kWp (16 * 400Wp REC Alpha) facing ESE + 5kW Huawei inverter + 10kWh Huawei battery. Buckinghamshire.2
-
July results.
Bad month with 93% of target. Big spread, with 88% for the ESE and 102% for the WNW.
Generated 575kWh (103.12 O's).
Imported 179kWh.
Exported 329kWh.
Total consumption 425kWh.
Gas was ~88kWh. [DHW & oven.]
Consumption still down to a more reasonable level (including BEV charging). But the very patchy weather, and rolling clouds, meant a lot of BEV charging was done overnight. A2A units not needed during the month.
Just a small(ish) batt of 4-5kWh, probably would have reduced import to zero(ish), but batts still some time away as the market is so messy.
Worst July generation, since install.
Year end projection of ~6,500kWh of leccy consumption, including BEV's and some space heating from A2A units. Gas projection ~6,000kWh.
Mart. Cardiff. 8.72 kWp PV systems (2.12 SSW 4.6 ESE & 2.0 WNW). 20kWh battery storage. Two A2A units for cleaner heating. Two BEV's for cleaner driving.
For general PV advice please see the PV FAQ thread on the Green & Ethical Board.2 -
31st was worst day of the month, just 0.84 O's
Ended up at 85% of PVGIS for JulyBarnsley, South Yorkshire
Solar PV 5.25kWp SW facing (14 x 375) Lux 3.6kw hybrid inverter installed Mar 22 and 9.6kw Pylontech battery
Daikin 8kW ASHP installed Jan 25
Octopus Cosy/Fixed Outgoing1 -
Stuck with July’s poor weather here today! 2.725 O’s16 Sanyo Hit 250s.4kWp SMA 3.8kWp inverter. SW roof. 28° pitch. Minimal shade. Nov 2011 install. Hybrid car. Ripple Kirk Hill. N.E Lincs Coast.2
-
Best day of the month!
2.24 O's3.795 kWp Solar PV System. Capital of the Wolds2
Confirm your email address to Create Threads and Reply

Categories
- All Categories
- 351.1K Banking & Borrowing
- 253.2K Reduce Debt & Boost Income
- 453.6K Spending & Discounts
- 244.1K Work, Benefits & Business
- 599.1K Mortgages, Homes & Bills
- 177K Life & Family
- 257.5K Travel & Transport
- 1.5M Hobbies & Leisure
- 16.1K Discuss & Feedback
- 37.6K Read-Only Boards