Not much better here....2.41 Os. I thought it was a better day than that.
2.8 0's.......but well above the daily 1.1 0's I now need for August's PVGIS.:cool:4kWp (black/black) - Sofar Inverter - SSE(141°) - 30° pitch - North LincsInstalled June 2013 - PVGIS = 3400Sofar ME3000SP Inverter & 5 x Pylontech US2000B Plus & 3 x US2000C Batteries - 19.2kWh0 -
Best day of the month. 4.40sNorthern Lincolnshire. 7.8 kWp system, (4.2 kw west facing panels , 3.6 kw east facing), Solis inverters, Solar IBoost water heater, Mitsubishi SRK35ZS-S and SRK20ZS-S Wall Mounted Inverter Heat Pumps, ex Nissan Leaf owner)0
-
5.5 O’s today & a good chance of reaching August PVGIS tomorrow.:cool:4kWp (black/black) - Sofar Inverter - SSE(141°) - 30° pitch - North LincsInstalled June 2013 - PVGIS = 3400Sofar ME3000SP Inverter & 5 x Pylontech US2000B Plus & 3 x US2000C Batteries - 19.2kWh0
-
Was your FIT payment later than usual? I had to submit mine earlier this 1/4 due to being away and it took 9 working days..:eek: not like EoN in the past...:( from 18/08/19 - 22/08 inclusive managed 4 Hawaii's + 0.392 O's...:beer: Today was just A/an Hawaii + 0.6 O's...3.25 O's yesterday....and my FITs payment came:beer:
2.5 kWp PV system, SSW facing, 45 Deg Roof. ABB Inverter, Monitor: 'Wattson'.
Reg. for FIT Nov 2011. "It's not what you generate; it's how you use it that matters". One very clean Vauxhall Diesel Sri, £30.00 Road Tax:
Definition of 'O's = kWh/kWp (kWh = your daily & accurate Generation figure) (kWp = the rated output of your PV Panels).0 -
Oscargrouch wrote: »Was your FIT payment later than usual? I had to submit mine earlier this 1/4 due to being away and it took 9 working days..:eek: not like EoN in the past...:( from 18/08/19 - 22/08 inclusive managed 4 Hawaii's + 0.392 O's...:beer: Today was just A/an Hawaii + 0.6 O's...

No, I submitted readings on the evening of the 14th. In the bank 4 working days later:T
Almost a/an Hawaii today:mad: 4.9 O's here:D16 Sanyo Hit 250s.4kWp SMA 3.8kWp inverter. SW roof. 28° pitch. Minimal shade. Nov 2011 install. Hybrid car. Ripple Kirk Hill. N.E Lincs Coast.0 -
Projecting 111% for the month, and year end close to best ever (2014).Mart. Cardiff. 8.72 kWp PV systems (2.12 SSW 4.6 ESE & 2.0 WNW). 28kWh battery storage. Two A2A units for cleaner heating. Two BEV's for cleaner driving.
For general PV advice please see the PV FAQ thread on the Green & Ethical Board.0 -
Did your early reporting break their 3 month rule ? Quite possible that they feel entitled to ignore any inputs which they consider too early. If the 'robot' rejects a set, it very likely takes some time before anyone gets round to investigating & processing the info.Oscargrouch wrote: »Was your FIT payment later than usual? I had to submit mine earlier this 1/4 due to being away and it took 9 working days..NE Derbyshire.4kWp S Facing 17.5deg slope (dormer roof).24kWh of Pylontech batteries with Lux controller BEV : Hyundai Ioniq50 -
No Eric; submitted it on 11th August (within the 14 day window of due date (22/08) got money in Bank on the 22nd...:cool:...Did your early reporting break their 3 month rule ? Quite possible that they feel entitled to ignore any inputs which they consider too early. If the 'robot' rejects a set, it very likely takes some time before anyone gets round to investigating & processing the info.
2.5 kWp PV system, SSW facing, 45 Deg Roof. ABB Inverter, Monitor: 'Wattson'.
Reg. for FIT Nov 2011. "It's not what you generate; it's how you use it that matters". One very clean Vauxhall Diesel Sri, £30.00 Road Tax:
Definition of 'O's = kWh/kWp (kWh = your daily & accurate Generation figure) (kWp = the rated output of your PV Panels).0 -
That seems pretty straightforward. Due date was 22/08 but they'll accept an earlier report; that doesn't mean they'll pay before the due date and in this instance they seem to be working to that 'rule' by paying on the due date. I'd be really impressed if Scottish Power got anywhere near matching that (but before anyone suggests swapping - it's really not worth the effort just to get cash two weeks earlier).Oscargrouch wrote: »No Eric; submitted it on 11th August (within the 14 day window of due date (22/08) got money in Bank on the 22nd....NE Derbyshire.4kWp S Facing 17.5deg slope (dormer roof).24kWh of Pylontech batteries with Lux controller BEV : Hyundai Ioniq50 -
Oscargrouch wrote: »No Eric; submitted it on 11th August (within the 14 day window of due date (22/08) got money in Bank on the 22nd...:cool:...

I put my reading in on the 14th whether I'm on holiday or not!
I check the gen meter before I go, and use Wattson anywhere for the days I'm away.:D
I also do this for the leccy and gas readings;)16 Sanyo Hit 250s.4kWp SMA 3.8kWp inverter. SW roof. 28° pitch. Minimal shade. Nov 2011 install. Hybrid car. Ripple Kirk Hill. N.E Lincs Coast.0
Confirm your email address to Create Threads and Reply
Categories
- All Categories
- 352.4K Banking & Borrowing
- 253.7K Reduce Debt & Boost Income
- 454.4K Spending & Discounts
- 245.4K Work, Benefits & Business
- 601.2K Mortgages, Homes & Bills
- 177.6K Life & Family
- 259.2K Travel & Transport
- 1.5M Hobbies & Leisure
- 16K Discuss & Feedback
- 37.7K Read-Only Boards