FIT Rate 2018-19
Options
Comments
-
It confused me at first too.
What cannonball... really wants (and what I needed) can be found from Merlin's first link : https://www.ofgem.gov.uk/environmental-programmes/fit/fit-tariff-rates
In my case, that will give me 50.67ppu for generation plus another 3.57ppu for deemed export. i.e. a total payment of 50.67 + 0.5*3.57 or 52.455ppuNE Derbyshire.4kWp S Facing 17.5deg slope (dormer roof).24kWh of Pylontech batteries with Lux controller BEV : Hyundai Ioniq50 -
Yes, I'm glad you finally see what I mean.
I want Ofgem published rates and have asked them to do so this morning.
It doesn't seem too much to ask.
The current table, which I had looked at before you referred me to it, doesn't have the rates.0 -
You're quoting 2017-18 rates EricMears0
-
cannonballdaze wrote: »Yes, I'm glad you finally see what I mean.
I want Ofgem published rates and have asked them to do so this morning.
It doesn't seem too much to ask.
The current table, which I had looked at before you referred me to it, doesn't have the rates.
Only figure out what you meant because I had exhausted every other option!
The information is there! I put a link up to it and its been there just not labelled correctly!
Seriously is this what the world has come to?
Can you not just open your eyes and look?
I will know in future not to bother to help you!3.795 kWp Solar PV System. Capital of the Wolds0 -
cannonballdaze wrote: »Yes, I'm glad you finally see what I mean.
I want Ofgem published rates and have asked them to do so this morning.
It doesn't seem too much to ask.
The current table, which I had looked at before you referred me to it, doesn't have the rates.
Hiya, go to the page Merlin gave
Feed-In Tariff (FIT) rates
scroll down 2/3rds of the way to the list of publications, then click on the first one:
Feed-in Tariff (FIT): Tariff Table 1 April 2018
scroll down to the link:
Feed-in Tariff (FIT): Tariff table 1 April 2010 - 31 March 2018
click on it for a spreadsheet,
scroll along the bottom of the spreadsheet for a page that matches your install date, eg apr 2011 to Mch 2012 (for me) and click on it
find your install, eg for myself
Photovoltaic
retro fit
max 4kWp
HTH.Mart. Cardiff. 5.58 kWp PV systems (3.58 ESE & 2.0 WNW). Two A2A units for cleaner heating.
For general PV advice please see the PV FAQ thread on the Green & Ethical Board.0
This discussion has been closed.
Categories
- All Categories
- 343.2K Banking & Borrowing
- 250.1K Reduce Debt & Boost Income
- 449.7K Spending & Discounts
- 235.3K Work, Benefits & Business
- 608.1K Mortgages, Homes & Bills
- 173.1K Life & Family
- 247.9K Travel & Transport
- 1.5M Hobbies & Leisure
- 15.9K Discuss & Feedback
- 15.1K Coronavirus Support Boards